auto bumper mould
Model No.: | auto bumper mould |
Min. Order: | 1SET |
Packaging: | WOODEN |
Delivery Time: | 45 Days |
Place of Origin: | china |
Brand: | EE |
Product Description
We can
offer you:
Good steel
with high hardness
Good
accessories with high brightness
Good
machining with high precise
In-time
response on email, telephone calls or fax
In-time
supply the quotation and mould designs
In-time
communication on the technical points
In-time
sending pictures for the mould machining progress and mould finishing
schedule
In-time
mould test and sample delivery
In-time
mould delivery
Additionally,
we can offer:
Product and
mould design provided your idea
Custom
product production with OEM/ODM service
Mould flow
analysis
Rapid
prototype (outsourcing)
Mould
quality control:
We
have good QC system, covering IQC, IPQC and OQC.
For
the Q/C of mould, there are 3 steps:
1.
Mould Material Q/C
-
Mould Steel Checking (Hardness, flaw detection)
-
Mould Standard Spare Parts Checking (hardness, size, flaw checking)
2.
Mould Making Process Q/C
-
design checking (part design, mould design, mould engineering
drawing)
-
each part of mould`s
size checking after machining according to 2D drawing
-
mould testing (check mould running condition)
3.
Check with customer`s
requirement again before mould shipping.
Service:
We
make the commitment of service as below:
Lead
time: 1-5 working days
Design
period: 1-5 working days
Email
reply: within 24 hours
Quotation:
within 2 working days
Customer
complaints: reply within 12 hours
Phone
call service: 24H/7D/365D
Spare
parts: 30%, 50%, 100%, according to specific requirement
Free
sample: according to specific requirement
We
guarantee to provide the best and quick mold service for customers!
Mould
pack and shipping:
Anti-rust
oil is painted first, then plastic film, and finally wooden case.
Sent
together with the mould:
a)
Mould manual instruction
b)
Engineering drawing in flash disk
c)
One more set of mould spare parts: heater, ejector pin, bush, water nozzle,
water pipe, hanging ring.
Mould
maintenance:
a)
When the mould is vacant, spray the anti-rust oil
b)
To clean the gate and cooling system regularly
c)
Avoid using recycled material if the mould is suitable for virgin material
only
After-sales
service:
a)
one-year after-sale technique support
Attention
pls:
Price varies
in different quality level. When you send us the mould inquiry, please offer the
following information:
1) Mould
steel raw material you require or mould life your require
2) Mould
cavity no you want
2d or 3d
product drawing, or pictures with detailed size information(L*W*H, and
thickness), or samples
4) Mould
standard
5) Hot
runner or cold runner, if hot runner, tell me brand of hot runner you
require
6) Raw
material of the product
7) Sample
quantity and packing